Inspection of the trench |
 |
|
|
 |
Setting of the cables |
|
|
Crimping of the connector |
 |
|
|
 |
Deep indented connector |
|
|
High permitivity tape |
 |
|
|
 |
Setting of the joint body |
|
|
Installation of the joint body |
 |
|
|
 |
Reset of the splice |
|
|
Releasing of the self-extract
carrier |
 |
|
|
 |
Sealing and binding of the joint
body
case of copper wires screen
setting of the metallic screen |
|
|
Case of copper tape screen |
 |
|
|
 |
Water tightness |
|
|
Jacket lubrification |
 |
|
|
 |
Setting of the envellope |
|
|
Straight joint |
 |
|
|
 |
Straight joint in trench |
|
|
Assembly team
Mesc Curaçao |
 |
|
|